Run a Faster, More Profitable F&B Factory

The 3 Hidden Profit Leaks in F&B Production
01
CIP That Cleans to a Timer, Not a Result
Most plants still stop rinses based on time or conductivity — not verified cleanliness. This leads to hours of unnecessary CIP runtime every day or undetected underwash that triggers re-cleans, downtime, or product risk.
02
SKU Growth Is Killing Margin
More products = more changeovers = more flushes, more scrap, more schedule disruption. Every imperfect cutover means good product lost, capacity lost, and labor scrambling to recover the plan.
03
Sustainability Goals Stall Without Process Data
Water and chemical use aren’t reduced in sustainability meetings — they’re reduced in the pipe. Without real-time validation, “eco targets” become paperwork, not measurable outcomes.

The Only System That Knows What’s in the Pipe — And Acts on It
.jpg)

Inline Intelligence for the Most Complex F&B Lines
From beverages and dairy to sauces, dressings, and liquid CPG, Laminar reads fluid changes at the molecular level — in milliseconds. Our AI then triggers PLC actions automatically, giving manufacturers real-time validation, tighter quality control, faster CIP, and flawless changeovers.
Self-Optimizing CIP & Changeovers
AI continuously validates every fluid transition and automatically triggers PLC actions to prevent overwash, eliminate underwash, and reduce changeover loss.
Live Process Validation, Not Estimates
Real-time monitoring of product, rinse, and chemical transitions ensures quality, protects batches, and removes operator guesswork.
Installed in Hours, Not Weeks
Fits standard sanitary process lines. No downtime, no fabrication, no code rewrites. Live in days, not quarters.
Built for Food Safety & Compliance
3-A and BPE sanitary certified. Non-contact. Proven in allergen-sensitive, high-SKU, and high-care environments.
Global Beverage Producer Recovered 1000s of Production Hours with Smarter CIP
By validating rinse completion in real time, a global bottler cut CIP time by 15%, reduced water use, and unlocked stranded capacity—without equipment changes or added headcount.
See How Much Capacity Your Factory Is Leaving in the Pipe
Give us 15 minutes to calculate the savings estimate across CIP, changeovers, and resource use. No commitment required.

